PiWars 2018: The Aftermath - 2 (Lessons learnt)
2018-4-25
In the last post I wrote what went right and wrong with the build. However, build is only a small part of the event preparation. Attending PiWars is a full scale project. To be successful you need to manage your team's time well and split the work up correctly for things to line up correctly for success. Work needs to be split up into Software, Hardware, Design, Fabrication and Integration.
